Loading...
HomeMy WebLinkAboutResolution - City Council - Regular - 2025-96 - 8/4/2025Page 1 of 18 RESOLUTION NO. 2025-96 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF FORT MYERS, FLORIDA, AMENDING THE SCHEDULE FOR CERTAIN FEES AND CHARGES FOR COMPREHENSIVE PLAN AMENDMENTS, DEVELOPMENT ORDERS, PERMIT APPLICATIONS, ASSOCIATED PROCESSES, AND ACTIVITIES RELATED THERETO; RESCINDING RESOLUTION NO. 2014-26 AND PROVIDING FOR AN EFFECTIVE DATE. WHEREAS: The Land Development Code, Chapter 98, Section 98.3.14.A provides that City Council shall establish by resolution fees for comprehensive plan amendments, development orders, and permit applications under the Land Development Code. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FORT MYERS, FLORIDA, that EFFECTIVE IMMEDIATELY UPON ADOPTION FEE SCHEDULE COMMUNITY DEVELOPMENT DEPARTMENT BUILDING, PERMITTING AND INSPECTIONS DIVISION PERMIT TYPE BASE FEE ADDITIONAL FEE A CONSTRUCTION PERMITS Fees paid at time of permit issuance All construction permits not otherwise listed in fee schedule: Construction Job Valuation: a) Up to $100,000. b) $100,001 to $250,000. c) $250,001 to $500,000. d) $500,001 to $1,000,000. e) $1,000,001 and over. $101.00 $1,305.00 $2,017.00 $3,142 $5,017 PLUS $12.04 per $1,000 of construction valuation. PLUS $4.75 per $1,000 of construction valuation, after $100,000.00. PLUS $4.50 per $1,000 of construction valuation, after $250,000. PLUS $3.75 per $1,000 of construction valuation, after $500,000. PLUS $3.00 per $1,000 of construction value, 2. Site. $100.00 PLUS $5.10 per $1,000 of construction OVER THE COUNTER PERMITS Page 2 of 18 Air Conditioning (A/C): Existing/Replace/Repair i. Commercial/Multi-Family ii. Single-Family b) Electric: New i. Single-family c) Electric: Existing/Replace/Repair i. Commercial/Multi-Family ii. Single-Family d) Electric: Upgrade/Alteration/Repair a) Single-family e) FPL Hook up i. Commercial/Multi-Family ii. Single-Family f) Fuel/Gas i. Single-Family g) Garage Door Replacement i. Single-Family h) Irrigation/Sprinklers i. Commercial/Multi-Family ii. Single-Family i) Mechanical: Existing Repair i. Commercial/Multi-Family ii. Single-Family j) Mechanical: Upgrade/Alteration/Repair i. Single-Family k) Other/Siding i. Commercial/Multi-Family ii. Single-Family l) Plumbing: New i. Single-Family m) Plumbing: Existing/Replace/Repair i. Commercial/Multi-Family ii. Single-Family n) Plumbing: Upgrade/Alteration/Repair i. Commercial/Multi-Family ii. Single-Family o) Minor Selective Demo/Engineer Report i. Commercial/Multi-Family ii. Single-Family p) Roofing: Re-Roof, Roof Over, & Repair i. Commercial/Multi-Family ii. Single-Family q) Shutter/Storm Panel i. Single-Family r) Solar Pool Heater/Water Heater i. Commercial/Multi-Family ii. Single-Family a) Storm Panel i. Commercial/Multi-Family $120.00 $95.00 $150.00 $150.00 $150.00 $150.00 $95.00 $95.00 $150.00 $95.00 $95.00 $95.00 $120.00 $95.00 $95.00 $150.00 $150.00 $150.00 $150.00 $150.00 $150.00 $150.00 $95.00 $95.00 $210.00 $150.00 $150.00 $95.00 $95.00 PLUS $50.00 for every 3 additional units, after 3 units. PLUS $75.00 if there is electric. Page 3 of 18 Temporary Outdoor Activities, Tents, and Signs and Inspections (Each). A. Outdoor Activity. Required for any event held on private property, unless exempt (see Land Development Code, section 118.3.5). The outdoor activity permit includes the erection of temporary tents. B. Tent. Required for tents larger than 100 square feet installed in conjunction with a special event (see Land Development Code, section 118.3.5 for definition of special event). Tents 100 square feet or smaller installed in conjunction with a special event are exempt from permitting and fees but are subject to fire inspections (for additional applicable fees see Code of Ordinances section 40-4 (jj)). C. Temporary Sign: (see Land Development Code, section 118.3.5 for exemptions for temporary signs installed in $213.00 $213.00 $213.00 Sub-Trade (Each):Plumbing, electrical, mechanical, and roofing permits that are subordinate to a building addition, remodel, renovation and build-out without an additional charge for construction valuation or plan review when the fees paid on the building permit include the construction valuation of the work for which the subordinate permit is issued. Otherwise, sub-permits (each). Demolition. $346.00 PLUS $0.10 per square foot of gross building 7. Moving Building. All fees for moving buildings declared historic on a national, foot of the area of the building being moved. PLAN REVIEW. Each permit applications wherein plans, or technical review is required. Fees shall be paid at the time of permit application submission. Equal to 30 percent of the permit fee or a minimum of $78.00, whichever is greater. C. RESUBMIT REVIEW.Prior to permit issuance, second and subsequent reviews to address plan review comments. Fee shall be paid after completion of the resubmit review process and prior submittal of any additional resubmits. There is no charge for the first resubmit review process to address $107.00 PLUS $70.00 per technical review. Page 4 of 18 D. REVISION.After permit issuance, each revision. Any additional plan review and permitting fees, impact fees and any other fees resulting from any increase in the value of the construction cost or other factor affecting the project shall be assessed. The revision fee shall be paid after the completion of the revision $107.00 PLUS $105.00 per technical review. E. CERTIFICATES AND AFFIDAVITS.Each certificate of occupancy, certificate of completion, affidavits of code compliance or completion status, and other certifications issued by the Building Official. Collected at permit issuance, unless not issued as a result of a $50.00 F. TEMPORARY CERTIFICATE OF OCCUPANCY; Issuance, Extensions, and Expirations 1. Temporary Certificate of Occupancy. Shall be requested in writing and may be issued at the discretion of the Building Official after a complete review of all relevant facts has been conducted and it is determined to be in the best interest of all parties. The city and Building Official have no obligation whatsoever to issue a temporary certificate of occupancy. The city hall be held harmless in any action which a temporary certificate of occupancy is issued. The cash bond shall be submitted to the city and held without interest until all requirements are met and the final certificate of occupancy is issued. In lieu if the cash bond requirement, the Building Official reserves the right, at his discretion, to receive a letter of credit from a local financial institution, which shall be returned to the permit holder upon satisfaction of the terms of the temporary certificate of occupancy. The temporary certificate of occupancy shall be valid for 90 days nce. 100 percent of the value if any outstanding work. Extension of Temporary Certificate of Occupancy. extensions require submission of a written request letter from the contractor or owner, prior to expiration of the temporary certificate of occupancy. The extension of a temporary certificate of occupancy shall be at the discretion of the Building Official. Extension of the temporary certificate of occupancy: a) First 90-day extension. b) Second 90-day extension. c) Third 90-day extension. D. Fourth and subsequent 90 day extension. $200.00 $400.00 $800.00 $1,600.00 Page 5 of 18 3.Expiration of Certificate of Occupancy. Failure to complete the requirements of the temporary certificate of occupancy by obtaining satisfactory final inspections shall be prima facie evidence or failure to complete the work within the timeframe specified, thereby authorizing the city to impose a $500.00 fine and revoke the cash bond (or equivalent) to offset the additional administrative costs to ensure the contractor completes the job. Any structure or site occupied under a temporary certificate of occupancy shall by vacated immediately upon expiration of the temporary certificate of G. ADDITIONAL FEES. COMMUNITY DEVELOPMENT DEPARTMENT Planning/Development Services A. PLAN REVIEW: Applications for building, site work, and sign permits shall include any or all of the following: 1. Generally. special districts conformance including historic districts, frontage road requirements, land area including gross floor area and open space regulations, principal and accessory use setbacks from property line, riverfront setbacks, parking calculations for on-site spaces, loading, stacking for drive-through, compliance for size and number with Americans with Disabilities Act (ADA) parking lot configuration and landscaping, buffer yard sizes and planting calculations, fences and walls, dumpster enclosure construction site screening, residential density calculations, building height, living area square footage, FAA Tall Structure sign-off, FAA airspace notification map, compliance with airport zone special landscaping requirements set by Lee County to discourage birds in flight paths, separation distances between bars and lounges from churches and schools, sight/distance visibility at intersections, exterior wall treatments, and architectural details for exterior walls, and review for the need for additional application s including variances, administrative deviations, warrants, conditional 2. Landscaping review. yards, parking lots, building perimeter planting, enhanced landscaping requirements, percentages for native species, littoral planting, plant materials, plant installation, irrigation plans, special street tree district regulations, existing tree Sign review. zone, billboards, banners, removal of signs, Smart Code regulations, exemption areas, exempted signs, special areas including historic areas, special uses, pole signs, monument signs, electronic signs, wall signs, parking area signs, campus signs, multi-story buildings, multi-building complexes, - Page 6 of 18 alone businesses, professional signs, construction signs, real estate signs and political signs. Planned unit development. Schedule of uses compliance, deviations and warrants compliance, compliance with all terms and conditions, verification of concept plan and construction plans match, architectural standards, signs, landscaping, open B. SITE WORK PLAN REVIEW 1. Residential development site 2. Residential development site $240.00 PLUS $4.00 per acre or Commercial development. $240.00 PLUS $6.00 per acre or portion thereof in 4. C. TREE REMOVAL. D. SINGLE-FAMILY DUPLEX AND MULTI-FAMILY PLAN REVIEW. The single-family, duplex, and multi-family, not contained in subsection B. above. our one hundredths of one percent of the job value or a minimum of $15.00, whichever is greater. E. ZONING PLAN REVIEW. section. The zoning plan review for all other permits not specified in this section shall be. tenths of one percent of the job value or a minimum of $25.00, whichever is greater F. REVISIONS/ADDITIONS. revisions or additions. ive tenths of one percent of the job value, or a minimum of $105.00, whichever is greater. G. ADDITIONAL APPLICABLE FEES. PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION A. RIGHT OF WAY PERMIT. Any work within public right-of-way. 1. Single-Family or Duplex. A. Single Driveway. B. Double Driveway. Page 7 of 18 Commercial projects which include three (3) residential units B. SITE CLEARING, GRUBBING, GRADING, EXCAVATING, TREE REMOVAL OR FILLING OF A SITE OR LOT. Where environmentally sensitive lands are involved, clearance letters from appropriate regulatory agencies must first be received before the city issues a site clearing permit. Tree removal per acre (paid concurrent with the site clearing permit? A tree survey shall be provided by the applicant according to the Land Development Code prior to any site preparation. Site clearing. $100.00 $685.00 Minimum PLUS $45.00 per acre or portion thereof. C. SITE WORK. Includes any or all paving, drainage, water, sewer, and review. Residential development site less than two (2) acres and more than two (2) units. $1,306.00 unit. Residential development site equal to or greater than two (2) acres and more than two (2) units. portion thereof in Commercial development site. $2,515.00 PLUS $18.00 per acre or portion thereof in D. UTILITY INSPECTION. the engineer’s cost estimate for water, sewer, and drainage construction E. ROADWAY INSPECTION. One percent of the engineer’s cost estimate for road construction F. SINGLE-FAMILY, DUPLEX, AND MULTI-FAMILY PLAN REVIEW. One-tenth of one percent of the job value or a minimum of $50.00, whichever is greater. G. ENGINEERING PLAN REVIEW for all other permits not specified in this section. Four-tenths of one percent of the job value or a minimum of $95.00. Page 8 of 18 whichever is H. PLAN REVIEW FOR REVISIONS/ADDITIONS. After permit issuance, $95.00 or five- tenths of one percent of the job value, whichever is greater. I. RESUBMIT REVIEW. Prior to permit issuance, second and subsequent reviews to address plan review comments to site commercial permits, per review. The resubmit fee shall be collected after the completion of the resubmit review process but prior to submittal of any additional resubmits. There is no charge for the first resubmit review process to address $240.00 J. ADDITIONAL APPLICABLE FEES. See Supplemental Fees and Regulations in this resolution. SUPPLEMENTAL FEES AND REGULATIONS A. CALCULATION. The fees for permits shall be determined according to the fee schedule which each applicable section. Where permit fees are calculated based on construction value, the current edition of the International Code Council’s schedule of valuation for new buildings for the R.S. Means for all other improvements shall be used. Where permit fees are calculated based on square footage, the gross square footage of the total floor area of a commercial B. FLOODPLAIN. a) Flood review. b) Flood inspection. $50.00 C. MILESTONE INSPECTION REPORTS. a) Shall be required for buildings that are three or more in height and have condominium or cooperative form of $50.00 D. EXPEDITED/FAST TRACK PLAN REVIEWS. performed by the Community Development Department, Public Works Department, and Fire Department shall be available subject 1. submitted in sufficient quantity to provide one plan for each review entity. Nothing in this subsection shall supersede the requirements of F.S.§553.80(2)(b), which requires specific penalty fees for plans reviewed for compliance with the state building code which failed to correct a code violation Page 9 of 18 The applicant shall write "fast track services requested" on the construction permit application in the description of work or shall provide other written means of communication requesting fast track services. The written request shall be prima facie evidence that the applicant is aware of the additional fees associated with the expedited/fast track shall be conducted outside of regular working hours, with the 4 be equal to the regular plan review fees or a minimum as a) i. Building ii. Zoning iii. Engineering iv. Fire Preventi $300.00 $152.00 $76.00 N/A PLUS $30.00 clerical fee. b) Multi Family/Commercial i. Building ii. Zoning iii. Engineering iv. Fire Prevention $600.00 $193.00 $125.00 PLUS $30.00 clerical fee. Each resubmit review, including the first resubmit review, per discipline. In addition to all regular revision review 6. $147.00 In addition to all regular revision review 7. applicant to identify and obtain. Nothing in this subsection shall supersede the requirements of F.S. §553.80(2)(c), which requires specific penalty fees for the third and subsequent re- inspections that result in the failure to comply with a rejection notice when such failure is a violation of the state Page 10 of 18 The building official may refuse acceptance of fast applications if available resources make such services E. RE-INSPECTION 1. Re- was not to code or plan, or access for the inspection is $50.00 2. date of issuance or last inspection. No subsequent inspections or other permits will be issued $100.00 F. PARTIAL INSPECTION. $50.00 G. SPECIAL INSPECTIONS performed outside normal working hours: Approved by the Building Official, City Engineer, Fire Marshal, or their designees, when requested by the permit holder, shall be paid at the time of issuance of the final certificate of occupancy, or in 1. - Minimum Fee City Recognized Holiday, per hour, portal to portal. Minimum Fee H. TIME SPECIFIC INSPECTIONS,paid in advance. I. BUSINESS TAX RECEIPTS, certificates of use and inspection. Note: A change of use requires a building permit to update occupancy 1. a) Zoning Certificate b) Fire Inspection c) Building Inspection d) Zoning Inspection e) Certificate of Use. $17.00 $30.00 $88.00 $10.00 $20.00 2,500 square feet a) Zoning Certificate b) Fire Inspection $17.00 $40.00 Page 11 of 18 Building Inspection d) Zoning Inspection e) Certificate of Use $10.00 $20.00 3.5,000 square feet a) Zoning Certificate b) Fire Inspection c) Building Inspection d) Zoning Inspection e) Certificate of Use $17.00 $50.00 $118.00 $10.00 $20.00 7,500 square feet a) Zoning Certificate b) Fire Inspection c) Building Inspection d) Zoning Inspection e) Certificate of Use $17.00 $60.00 $127.00 $10.00 $20.00 $302.00 10,000 square feet a) Zoning Certificate b) Fire Inspection $17.00 $70.00 Page 12 of 18 Building Inspection d) Zoning Inspection e) Certificate of Use $10.00 $20.00 $366.00 12,500 square feet a) Zoning Certificate b) Fire Inspection c) Building Inspection d) Zoning Inspection e) Certificate of Use $17.00 $80.00 $186.00 $10.00 $20.00 15,000 square feet a) Zoning Certificate b) Fire Inspection c) Building Inspection d) Zoning Inspection e) Certificate of Use $17.00 $90.00 $206.00 $10.00 $20.00 17,500 square feet a) Zoning Certificate b) Fire Inspection $17.00 $100.00 Page 13 of 18 Building Inspection d) Zoning Inspection e) Certificate of Use $10.00 $20.00 17,501 square feet and up a) Zoning Certificate b) Fire Inspection c) Building Inspection d) Zoning Inspection e) Certificate of Use $17.00 $110.00 $274.00 $10.00 $20.00 J. WORK WITHOUT PERMITS.The permit fee for any work started without a required permit will be doubled. PLUS: Any work that is substantially completed without a required $200.00 K. PERMIT EXTENSIONS, DUPLICATE PERMITS AND EXPIRED PERMITS First extension (prior to expiration date). the original permit or minimum of $50.00. 2. 50 percent of the original permit fee or minimum of $100.00. Requires a written letter to be submitted by the Contractor or owner requesting an extension and providing an explanation of the hardship causing delays in construction activity. The request shall be reviewed by the Building Official to determine whether the permit can be reinstated or if the revised plans are required to bring the permit plans into 50 percent of the original permit fee or minimum of $100.00, plus 50 percent of the original Page 14 of 18 fees if determined that revised plans are 4. $15.00 5. written letter to be submitted by the contractor or owner to request reinstatement. The Building Official shall determine whether the expired permit can be reinstated or if revised plans are required to bring the permit into compliance with the current codes. Reinstate expired permit, each. Revised plans $100.00 50 percent of the original plan review fee. PLUS applicable extension fee. L. REFUNDS No refund shall be given for: a) Work commenced. b) Permit extended. c) Permit expired. d) Plan review fee. e) Permits of $100.00 or less, unless issued in error by 2. fee. M. FEE WAIVERS. owned land or within public right-of-way, exclusive of fees required N. PERMIT APPLICATIONS; validity, extensions, and expiration 1. 2. 90 days may be allowed by the Building Official at no charge, provided the following conditions are met: a) Request is received prior to the permit application expiration date. b) Justifiable hardship is demonstrated. c) Plans submitted are in accordance with the current All expired permit applications approved under a previous code require a written letter to be submitted by the contractor or owner to request reinstatement. The Building $50.00 Page 15 of 18 be reinstated or if revised plans are required to bring the plans into compliance with the current codes, requiring a new permit application to be submitted and all applicable fees O. OTHER SERVICES of time, benefits, material, and outside services, plus an administrative fee of 20 percent as determined by the Building P. TECHNOLOGY FEE funds to be used exclusively for ongoing and future technology enhancements and replacements, related to permitting, to enhance customer service and efficiency. 3 percent of the permit fee, or minimum of $3.00, per PLANNING AND LAND DEVELOPMENT APPLICATIONS AND PUBLIC HEARINGS A. CHANGE OF LAND DEVELOPMENT CODE 1. a) Official Zoning Map Amendment – Rezoning i. 10 acres or less. ii. Greater than 10 acres. b) Land Development Code Text. c) Special Development Area and Master Development $3,000.00 $3,000.00 $3,000.00 3,000 B. AMENDMENT TO THE COMPREHENSIVE PLAN Administrative. a) Future land use map amendment. i. 10 acres or less. ii. Greater than 10 acres. b) Text amendment. $2,500.00 $2,500.00 $3,5 C. APPEAL TO THE BOARD OF ADJUSTMENTS Administrative adjustments, appeals, and administrative deviations. If appeal overturns the decision of the Community $1,000.00 D. CONDITIONAL USE (SPECIAL EXCEPTION) 1. a) Residential. b) All other uses. c) Amendments to previously approved conditional uses. $3,000.00 $3,000.00 $3,000.00 E. ISSUANCE OF VERIFICATION LETTERS for zoning classifications, land use designations, flood zones, certificates of occupancy, letters $150.00 Page 16 of 18 F. ANNEXATION Areas within the Urban Reserve Boundary. Areas targets in the Comprehensive Plan. 3.Areas outside the Urban Reserve Boundary. a) Under 50 acres. b) Over 50 acres. Plus per acres over 100 acres. $2,000.00 $2,000.00 Public Works/Engineering Review Fee. G. SUBDIVISION PLAT APPROVAL Preliminary Plat a) 5 acres or less. b) Greater than 5 acres. Public Works/Engineering Review fee. $1,000.00 $1,000.00 PLUS $15.00 per lot or tract. PLUS $15.00 per lot or tract. Final Plat. a) 5 acres or less. b) Greater than 5 acres. Public Works/Engineering Review Fee. $1,000.00 $1,000.00 PLUS $15.00 per lot or tract. PLUS $15.00 per lot or tract. 3.Lot Recombination. i. Residential. ii. All other land uses. $300.00 300 Lot Splits. H. VACATION OF Easements.$530.00 Right Way, including alleys.$1,317.00 3.Plats or portions thereof. $1,317.00 Public Works/Engineering Review. I. PLANNED UNIT DEVELOPMENT (PUD) i. One acre or less. ii. 3,000 3,000 i. Over one acre and up to ten acres. ii. $3, $3, 3.i. Ten acres to 50 acres. $3, Page 17 of 18 ii. $3, i. Greater than 50 acres. ii. $3, $3, Administrative deviations to previously approved PUD. i. First 5 deviations, each. ii. Sixth deviation and beyond. $1,000.00 Public Works/Engineering Review fee. J. COMMUNITY DEVELOPMENT DISTRICTS Less than 1,000 acres. Greater than 1,000 acres. 3 3.Expansion to an existing Community Development District, less than 1,000 acres. Expansion to an existing Community Development District, greater than 1,000 acres. L. K. ADMINISTRATIVE DEVIATIONS AND ADMINISTRATIVE ADJUSTMENTS from the Land Development Code, per deviation, from selected portions of Chapter 98 Administration, Chapter 118 Land Use Regulations, Chapter 126, 1. $500.00 2. $500.00 $155.00 M. L. VARIANCE 1. Single-family dwellings, each. $750.00 2. All other uses, each. $750.00 3. Sign variance, each. $750.00 ADMINISTRATIVE ADJUSTMENTS 1. Single-family dwellings, each. $500.00 2. All other uses, each. $500.00 N. DEVELOPER AGREEMENTS 1. i. Developer Agreements. ii. Amendments. $3,5 $3, P. O. MASTER DEVELOPMENT PLAN (MDP) 1. Application. PLUS applicable preliminary subdivision 2. each. $500.00 $500.00 Q. P. MISCELLANEOUS FEES 1. Voluntary address change, administrative. $250.00 2. Public hearing signs. $20.00 3. Public notice mailings, each. First class postage rate. Page 18 of 18 Newspaper advertisement, each.Actual cost charge News- Press The Community Development Department Director may waive any application fee when the City is the applicant or variance application fees for single-family dwellings when the applicant is indigent and provides an affidavit that shows family income to be below 80 percent of the median income for the Fort Myers/Cape Coral Metropolitan Statistical Area (MSA) as defined by the latest available Housing and Urban Development (HUD) Section 8 Income Limits, and provides a financial statement showing net assets of less than $10,000.00. 1. Resolution No. 2014-26 are hereby rescinded. 1. This resolution shall become effective immediately upon adoption.