HomeMy WebLinkAboutResolution - City Council - Regular - 2025-96 - 8/4/2025Page 1 of 18
RESOLUTION NO. 2025-96
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF FORT MYERS, FLORIDA, AMENDING THE SCHEDULE FOR CERTAIN
FEES AND CHARGES FOR COMPREHENSIVE PLAN AMENDMENTS, DEVELOPMENT ORDERS, PERMIT APPLICATIONS,
ASSOCIATED PROCESSES, AND ACTIVITIES RELATED THERETO; RESCINDING RESOLUTION NO. 2014-26 AND PROVIDING
FOR AN EFFECTIVE DATE.
WHEREAS: The Land Development Code, Chapter 98, Section 98.3.14.A provides that City Council shall establish by
resolution fees for comprehensive plan amendments, development orders, and permit applications under the Land
Development Code.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FORT MYERS, FLORIDA, that
EFFECTIVE IMMEDIATELY UPON ADOPTION
FEE SCHEDULE
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING, PERMITTING AND INSPECTIONS DIVISION
PERMIT TYPE BASE FEE ADDITIONAL FEE
A CONSTRUCTION PERMITS
Fees paid at time of permit issuance
All construction permits not otherwise listed in fee schedule:
Construction Job Valuation:
a) Up to $100,000.
b) $100,001 to $250,000.
c) $250,001 to $500,000.
d) $500,001 to $1,000,000.
e) $1,000,001 and over.
$101.00
$1,305.00
$2,017.00
$3,142
$5,017
PLUS $12.04 per $1,000
of construction
valuation.
PLUS $4.75 per $1,000
of construction
valuation, after
$100,000.00.
PLUS $4.50 per $1,000
of construction
valuation, after
$250,000.
PLUS $3.75 per $1,000
of construction
valuation, after
$500,000.
PLUS $3.00 per $1,000
of construction value,
2. Site. $100.00 PLUS $5.10 per $1,000
of construction
OVER THE COUNTER PERMITS
Page 2 of 18
Air Conditioning (A/C): Existing/Replace/Repair
i. Commercial/Multi-Family
ii. Single-Family
b) Electric: New
i. Single-family
c) Electric: Existing/Replace/Repair
i. Commercial/Multi-Family
ii. Single-Family
d) Electric: Upgrade/Alteration/Repair
a) Single-family
e) FPL Hook up
i. Commercial/Multi-Family
ii. Single-Family
f) Fuel/Gas
i. Single-Family
g) Garage Door Replacement
i. Single-Family
h) Irrigation/Sprinklers
i. Commercial/Multi-Family
ii. Single-Family
i) Mechanical: Existing Repair
i. Commercial/Multi-Family
ii. Single-Family
j) Mechanical: Upgrade/Alteration/Repair
i. Single-Family
k) Other/Siding
i. Commercial/Multi-Family
ii. Single-Family
l) Plumbing: New
i. Single-Family
m) Plumbing: Existing/Replace/Repair
i. Commercial/Multi-Family
ii. Single-Family
n) Plumbing: Upgrade/Alteration/Repair
i. Commercial/Multi-Family
ii. Single-Family
o) Minor Selective Demo/Engineer Report
i. Commercial/Multi-Family
ii. Single-Family
p) Roofing: Re-Roof, Roof Over, & Repair
i. Commercial/Multi-Family
ii. Single-Family
q) Shutter/Storm Panel
i. Single-Family
r) Solar Pool Heater/Water Heater
i. Commercial/Multi-Family
ii. Single-Family
a) Storm Panel
i. Commercial/Multi-Family
$120.00
$95.00
$150.00
$150.00
$150.00
$150.00
$95.00
$95.00
$150.00
$95.00
$95.00
$95.00
$120.00
$95.00
$95.00
$150.00
$150.00
$150.00
$150.00
$150.00
$150.00
$150.00
$95.00
$95.00
$210.00
$150.00
$150.00
$95.00
$95.00
PLUS $50.00 for every 3
additional units, after 3
units.
PLUS $75.00 if there is
electric.
Page 3 of 18
Temporary Outdoor Activities, Tents, and Signs and
Inspections (Each).
A. Outdoor Activity. Required for any event held on
private property, unless exempt (see Land
Development Code, section 118.3.5). The outdoor
activity permit includes the erection of temporary
tents.
B. Tent. Required for tents larger than 100 square feet
installed in conjunction with a special event (see Land
Development Code, section 118.3.5 for definition of
special event). Tents 100 square feet or smaller
installed in conjunction with a special event are
exempt from permitting and fees but are subject to
fire inspections (for additional applicable fees see
Code of Ordinances section 40-4 (jj)).
C. Temporary Sign: (see Land Development Code, section
118.3.5 for exemptions for temporary signs installed in
$213.00
$213.00
$213.00
Sub-Trade (Each):Plumbing, electrical, mechanical, and
roofing permits that are subordinate to a building addition,
remodel, renovation and build-out without an additional
charge for construction valuation or plan review when the fees
paid on the building permit include the construction valuation
of the work for which the subordinate permit is issued.
Otherwise, sub-permits (each).
Demolition. $346.00 PLUS $0.10 per square
foot of gross building
7. Moving Building.
All fees for moving buildings declared historic on a national,
foot of the area of the
building being moved.
PLAN REVIEW. Each permit applications wherein plans, or technical
review is required.
Fees shall be paid at the time of permit application submission.
Equal to 30
percent of the
permit fee or a
minimum of
$78.00,
whichever is
greater.
C. RESUBMIT REVIEW.Prior to permit issuance, second and
subsequent reviews to address plan review comments.
Fee shall be paid after completion of the resubmit review process
and prior submittal of any additional resubmits.
There is no charge for the first resubmit review process to address
$107.00 PLUS $70.00 per
technical review.
Page 4 of 18
D. REVISION.After permit issuance, each revision.
Any additional plan review and permitting fees, impact fees and any
other fees resulting from any increase in the value of the
construction cost or other factor affecting the project shall be
assessed.
The revision fee shall be paid after the completion of the revision
$107.00 PLUS $105.00 per
technical review.
E. CERTIFICATES AND AFFIDAVITS.Each certificate of occupancy,
certificate of completion, affidavits of code compliance or
completion status, and other certifications issued by the Building
Official.
Collected at permit issuance, unless not issued as a result of a
$50.00
F. TEMPORARY CERTIFICATE OF OCCUPANCY; Issuance, Extensions, and Expirations
1. Temporary Certificate of Occupancy.
Shall be requested in writing and may be issued at the
discretion of the Building Official after a complete review of all
relevant facts has been conducted and it is determined to be in
the best interest of all parties.
The city and Building Official have no obligation whatsoever to
issue a temporary certificate of occupancy.
The city hall be held harmless in any action which a temporary
certificate of occupancy is issued.
The cash bond shall be submitted to the city and held without
interest until all requirements are met and the final certificate
of occupancy is issued. In lieu if the cash bond requirement,
the Building Official reserves the right, at his discretion, to
receive a letter of credit from a local financial institution, which
shall be returned to the permit holder upon satisfaction of the
terms of the temporary certificate of occupancy. The
temporary certificate of occupancy shall be valid for 90 days
nce.
100 percent of the value
if any outstanding work.
Extension of Temporary Certificate of Occupancy.
extensions require submission of a written request letter from
the contractor or owner, prior to expiration of the temporary
certificate of occupancy. The extension of a temporary
certificate of occupancy shall be at the discretion of the
Building Official.
Extension of the temporary certificate of occupancy:
a) First 90-day extension.
b) Second 90-day extension.
c) Third 90-day extension.
D. Fourth and subsequent 90 day extension.
$200.00
$400.00
$800.00
$1,600.00
Page 5 of 18
3.Expiration of Certificate of Occupancy. Failure to complete the
requirements of the temporary certificate of occupancy by
obtaining satisfactory final inspections shall be prima facie
evidence or failure to complete the work within the timeframe
specified, thereby authorizing the city to impose a $500.00 fine
and revoke the cash bond (or equivalent) to offset the
additional administrative costs to ensure the contractor
completes the job. Any structure or site occupied under a
temporary certificate of occupancy shall by vacated
immediately upon expiration of the temporary certificate of
G. ADDITIONAL FEES.
COMMUNITY DEVELOPMENT DEPARTMENT
Planning/Development Services
A. PLAN REVIEW: Applications for building, site work, and sign permits shall include any or all of the following:
1. Generally.
special districts conformance including historic districts,
frontage road requirements, land area including gross floor
area and open space regulations, principal and accessory use
setbacks from property line, riverfront setbacks, parking
calculations for on-site spaces,
loading, stacking for drive-through, compliance for size and
number with Americans with Disabilities Act (ADA) parking lot
configuration and landscaping, buffer yard sizes and planting
calculations, fences and walls, dumpster enclosure
construction site screening, residential density calculations,
building height, living area square footage, FAA Tall Structure
sign-off, FAA airspace notification map, compliance with
airport zone special landscaping requirements set by Lee
County to discourage birds in flight paths, separation distances
between bars and lounges from churches and schools,
sight/distance visibility at intersections, exterior wall
treatments, and architectural details for exterior walls, and
review for the need for additional application s including
variances, administrative deviations, warrants, conditional
2. Landscaping review.
yards, parking lots, building perimeter planting, enhanced
landscaping requirements, percentages for native species,
littoral planting, plant materials, plant installation, irrigation
plans, special street tree district regulations, existing tree
Sign review.
zone, billboards, banners, removal of signs, Smart Code
regulations, exemption areas, exempted signs, special areas
including historic areas, special uses, pole signs, monument
signs, electronic signs, wall signs, parking area signs, campus
signs, multi-story buildings, multi-building complexes,
-
Page 6 of 18
alone businesses, professional signs, construction signs, real
estate signs and political signs.
Planned unit development. Schedule of uses compliance,
deviations and warrants compliance, compliance with all terms
and conditions, verification of concept plan and construction
plans match, architectural standards, signs, landscaping, open
B. SITE WORK PLAN REVIEW
1. Residential development site
2. Residential development site
$240.00 PLUS $4.00 per acre or
Commercial development. $240.00 PLUS $6.00 per acre or
portion thereof in
4.
C. TREE REMOVAL.
D. SINGLE-FAMILY DUPLEX AND MULTI-FAMILY PLAN REVIEW. The
single-family, duplex, and multi-family, not contained in subsection
B. above.
our one
hundredths of
one percent of
the job value or
a minimum of
$15.00,
whichever is
greater.
E. ZONING PLAN REVIEW.
section. The zoning plan review for all other permits not specified in
this section shall be.
tenths of
one percent of
the job value or
a minimum of
$25.00,
whichever is
greater
F. REVISIONS/ADDITIONS.
revisions or additions.
ive tenths of
one percent of
the job value,
or a minimum
of $105.00,
whichever is
greater.
G. ADDITIONAL APPLICABLE FEES.
PUBLIC WORKS DEPARTMENT
ENGINEERING DIVISION
A. RIGHT OF WAY PERMIT. Any work within public right-of-way.
1. Single-Family or Duplex.
A. Single Driveway.
B. Double Driveway.
Page 7 of 18
Commercial projects which include three (3) residential units
B. SITE CLEARING, GRUBBING, GRADING, EXCAVATING, TREE
REMOVAL OR FILLING OF A SITE OR LOT. Where environmentally
sensitive lands are involved, clearance letters from appropriate
regulatory agencies must first be received before the city issues a
site clearing permit.
Tree removal per acre (paid concurrent with the site clearing
permit?
A tree survey shall be provided by the applicant according to the
Land Development Code prior to any site preparation.
Site clearing.
$100.00
$685.00
Minimum
PLUS $45.00 per acre or
portion thereof.
C. SITE WORK. Includes any or all paving, drainage, water, sewer, and review.
Residential development site less than two (2) acres and more
than two (2) units.
$1,306.00
unit.
Residential development site equal to or greater than two (2)
acres and more than two (2) units. portion thereof in
Commercial development site. $2,515.00 PLUS $18.00 per acre or
portion thereof in
D. UTILITY INSPECTION.
the engineer’s
cost estimate
for water,
sewer, and
drainage
construction
E. ROADWAY INSPECTION. One percent of
the engineer’s
cost estimate
for road
construction
F. SINGLE-FAMILY, DUPLEX, AND MULTI-FAMILY PLAN REVIEW. One-tenth of
one percent of
the job value or
a minimum of
$50.00,
whichever is
greater.
G. ENGINEERING PLAN REVIEW for all other permits not specified in
this section.
Four-tenths of
one percent of
the job value or
a minimum of
$95.00.
Page 8 of 18
whichever is
H. PLAN REVIEW FOR REVISIONS/ADDITIONS. After permit
issuance,
$95.00 or five-
tenths of one
percent of the
job value,
whichever is
greater.
I. RESUBMIT REVIEW.
Prior to permit issuance, second and subsequent reviews to
address plan review comments to site commercial permits, per
review.
The resubmit fee shall be collected after the completion of the
resubmit review process but prior to submittal of any additional
resubmits.
There is no charge for the first resubmit review process to address
$240.00
J. ADDITIONAL APPLICABLE FEES. See Supplemental Fees and
Regulations in this resolution.
SUPPLEMENTAL FEES AND REGULATIONS
A. CALCULATION. The fees for permits shall be determined according
to the fee schedule which each applicable section. Where permit
fees are calculated based on construction value, the current edition
of the International Code Council’s schedule of valuation for new
buildings for the R.S. Means for all other improvements shall be
used. Where permit fees are calculated based on square footage,
the gross square footage of the total floor area of a commercial
B. FLOODPLAIN.
a) Flood review.
b) Flood inspection.
$50.00
C. MILESTONE INSPECTION REPORTS.
a) Shall be required for buildings that are three or more in
height and have condominium or cooperative form of
$50.00
D. EXPEDITED/FAST TRACK PLAN REVIEWS.
performed by the Community Development Department, Public
Works Department, and Fire Department shall be available subject
1.
submitted in sufficient quantity to provide one plan for each
review entity. Nothing in this subsection shall supersede the
requirements of F.S.§553.80(2)(b), which requires specific
penalty fees for plans reviewed for compliance with the state
building code which failed to correct a code violation
Page 9 of 18
The applicant shall write "fast track services requested" on
the construction permit application in the description of work
or shall provide other written means of communication
requesting fast track services. The written request shall be
prima facie evidence that the applicant is aware of the
additional fees associated with the expedited/fast track
shall be conducted outside of regular working hours, with the
4
be equal to the regular plan review fees or a minimum as
a)
i. Building
ii. Zoning
iii. Engineering
iv. Fire Preventi
$300.00
$152.00
$76.00
N/A
PLUS $30.00 clerical fee.
b) Multi Family/Commercial
i. Building
ii. Zoning
iii. Engineering
iv. Fire Prevention
$600.00
$193.00
$125.00
PLUS $30.00 clerical fee.
Each resubmit review, including the first resubmit review, per
discipline. In addition to
all regular
revision review
6. $147.00
In addition to
all regular
revision review
7.
applicant to identify and obtain. Nothing in this subsection
shall supersede the requirements of F.S. §553.80(2)(c), which
requires specific penalty fees for the third and subsequent re-
inspections that result in the failure to comply with a
rejection notice when such failure is a violation of the state
Page 10 of 18
The building official may refuse acceptance of fast
applications if available resources make such services
E. RE-INSPECTION
1. Re-
was not to code or plan, or access for the inspection is
$50.00
2.
date of issuance or last inspection.
No subsequent inspections or other permits will be issued
$100.00
F. PARTIAL INSPECTION. $50.00
G. SPECIAL INSPECTIONS performed outside normal working hours:
Approved by the Building Official, City Engineer, Fire Marshal, or
their designees, when requested by the permit holder, shall be paid
at the time of issuance of the final certificate of occupancy, or in
1. -
Minimum Fee
City Recognized Holiday, per hour, portal to portal.
Minimum Fee
H. TIME SPECIFIC INSPECTIONS,paid in advance.
I. BUSINESS TAX RECEIPTS, certificates of use and inspection. Note: A
change of use requires a building permit to update occupancy
1.
a) Zoning Certificate
b) Fire Inspection
c) Building Inspection
d) Zoning Inspection
e) Certificate of Use.
$17.00
$30.00
$88.00
$10.00
$20.00
2,500 square feet
a) Zoning Certificate
b) Fire Inspection
$17.00
$40.00
Page 11 of 18
Building Inspection
d) Zoning Inspection
e) Certificate of Use
$10.00
$20.00
3.5,000 square feet
a) Zoning Certificate
b) Fire Inspection
c) Building Inspection
d) Zoning Inspection
e) Certificate of Use
$17.00
$50.00
$118.00
$10.00
$20.00
7,500 square feet
a) Zoning Certificate
b) Fire Inspection
c) Building Inspection
d) Zoning Inspection
e) Certificate of Use
$17.00
$60.00
$127.00
$10.00
$20.00
$302.00
10,000 square feet
a) Zoning Certificate
b) Fire Inspection
$17.00
$70.00
Page 12 of 18
Building Inspection
d) Zoning Inspection
e) Certificate of Use
$10.00
$20.00
$366.00
12,500 square feet
a) Zoning Certificate
b) Fire Inspection
c) Building Inspection
d) Zoning Inspection
e) Certificate of Use
$17.00
$80.00
$186.00
$10.00
$20.00
15,000 square feet
a) Zoning Certificate
b) Fire Inspection
c) Building Inspection
d) Zoning Inspection
e) Certificate of Use
$17.00
$90.00
$206.00
$10.00
$20.00
17,500 square feet
a) Zoning Certificate
b) Fire Inspection
$17.00
$100.00
Page 13 of 18
Building Inspection
d) Zoning Inspection
e) Certificate of Use
$10.00
$20.00
17,501 square feet and up
a) Zoning Certificate
b) Fire Inspection
c) Building Inspection
d) Zoning Inspection
e) Certificate of Use
$17.00
$110.00
$274.00
$10.00
$20.00
J. WORK WITHOUT PERMITS.The permit fee for any work started
without a required permit will be doubled.
PLUS: Any work that is substantially completed without a required
$200.00
K. PERMIT EXTENSIONS, DUPLICATE PERMITS AND EXPIRED PERMITS
First extension (prior to expiration date).
the original
permit or
minimum of
$50.00.
2. 50 percent of
the original
permit fee or
minimum of
$100.00.
Requires a written letter to be submitted by the Contractor or
owner requesting an extension and providing an explanation
of the hardship causing delays in construction activity. The
request shall be reviewed by the Building Official to
determine whether the permit can be reinstated or if the
revised plans are required to bring the permit plans into
50 percent of
the original
permit fee or
minimum of
$100.00, plus
50 percent of
the original
Page 14 of 18
fees if
determined
that revised
plans are
4. $15.00
5.
written letter to be submitted by the contractor or owner to
request reinstatement. The Building Official shall determine
whether the expired permit can be reinstated or if revised
plans are required to bring the permit into compliance with
the current codes.
Reinstate expired permit, each.
Revised plans
$100.00
50 percent of
the original
plan review
fee.
PLUS applicable
extension fee.
L. REFUNDS
No refund shall be given for:
a) Work commenced.
b) Permit extended.
c) Permit expired.
d) Plan review fee.
e) Permits of $100.00 or less, unless issued in error by
2.
fee.
M. FEE WAIVERS.
owned land or within public right-of-way, exclusive of fees required
N. PERMIT APPLICATIONS; validity, extensions, and expiration
1.
2.
90 days may be allowed by the Building Official at no charge,
provided the following conditions are met:
a) Request is received prior to the permit application
expiration date.
b) Justifiable hardship is demonstrated.
c) Plans submitted are in accordance with the current
All expired permit applications approved under a previous
code require a written letter to be submitted by the
contractor or owner to request reinstatement. The Building
$50.00
Page 15 of 18
be reinstated or if revised plans are required to bring the
plans into compliance with the current codes, requiring a new
permit application to be submitted and all applicable fees
O. OTHER SERVICES
of time, benefits, material, and outside services, plus an
administrative fee of 20 percent as determined by the Building
P. TECHNOLOGY FEE
funds to be used exclusively for ongoing and future technology
enhancements and replacements, related to permitting, to
enhance customer service and efficiency.
3 percent of
the permit fee,
or minimum of
$3.00, per
PLANNING AND LAND DEVELOPMENT APPLICATIONS AND PUBLIC HEARINGS
A. CHANGE OF LAND DEVELOPMENT CODE
1.
a) Official Zoning Map Amendment – Rezoning
i. 10 acres or less.
ii. Greater than 10 acres.
b) Land Development Code Text.
c) Special Development Area and Master Development
$3,000.00
$3,000.00
$3,000.00
3,000
B. AMENDMENT TO THE COMPREHENSIVE PLAN
Administrative.
a) Future land use map amendment.
i. 10 acres or less.
ii. Greater than 10 acres.
b) Text amendment.
$2,500.00
$2,500.00
$3,5
C. APPEAL TO THE BOARD OF ADJUSTMENTS
Administrative adjustments, appeals, and administrative
deviations.
If appeal overturns the decision of the Community
$1,000.00
D. CONDITIONAL USE (SPECIAL EXCEPTION)
1.
a) Residential.
b) All other uses.
c) Amendments to previously approved conditional
uses.
$3,000.00
$3,000.00
$3,000.00
E. ISSUANCE OF VERIFICATION LETTERS for zoning classifications,
land use designations, flood zones, certificates of occupancy, letters
$150.00
Page 16 of 18
F. ANNEXATION
Areas within the Urban Reserve Boundary.
Areas targets in the Comprehensive Plan.
3.Areas outside the Urban Reserve Boundary.
a) Under 50 acres.
b) Over 50 acres.
Plus per acres over 100 acres.
$2,000.00
$2,000.00
Public Works/Engineering Review Fee.
G. SUBDIVISION PLAT APPROVAL
Preliminary Plat
a) 5 acres or less.
b) Greater than 5 acres.
Public Works/Engineering Review fee.
$1,000.00
$1,000.00
PLUS $15.00 per lot or
tract.
PLUS $15.00 per lot or
tract.
Final Plat.
a) 5 acres or less.
b) Greater than 5 acres.
Public Works/Engineering Review Fee.
$1,000.00
$1,000.00
PLUS $15.00 per lot or
tract.
PLUS $15.00 per lot or
tract.
3.Lot Recombination.
i. Residential.
ii. All other land uses.
$300.00
300
Lot Splits.
H. VACATION OF
Easements.$530.00
Right Way, including alleys.$1,317.00
3.Plats or portions thereof. $1,317.00
Public Works/Engineering Review.
I. PLANNED UNIT DEVELOPMENT (PUD)
i. One acre or less.
ii.
3,000
3,000
i. Over one acre and up to ten acres.
ii.
$3,
$3,
3.i. Ten acres to 50 acres.
$3,
Page 17 of 18
ii. $3,
i. Greater than 50 acres.
ii.
$3,
$3,
Administrative deviations to previously approved PUD.
i. First 5 deviations, each.
ii. Sixth deviation and beyond.
$1,000.00
Public Works/Engineering Review fee.
J. COMMUNITY DEVELOPMENT DISTRICTS
Less than 1,000 acres.
Greater than 1,000 acres. 3
3.Expansion to an existing Community Development District,
less than 1,000 acres.
Expansion to an existing Community Development District,
greater than 1,000 acres.
L.
K.
ADMINISTRATIVE DEVIATIONS AND ADMINISTRATIVE ADJUSTMENTS from the Land Development Code, per
deviation, from selected portions of Chapter 98 Administration, Chapter 118 Land Use Regulations, Chapter 126,
1. $500.00
2. $500.00
$155.00
M.
L.
VARIANCE
1. Single-family dwellings, each. $750.00
2. All other uses, each. $750.00
3. Sign variance, each. $750.00
ADMINISTRATIVE ADJUSTMENTS
1. Single-family dwellings, each. $500.00
2. All other uses, each. $500.00
N.
DEVELOPER AGREEMENTS
1. i. Developer Agreements.
ii. Amendments.
$3,5
$3,
P.
O.
MASTER DEVELOPMENT PLAN (MDP)
1. Application.
PLUS applicable
preliminary subdivision
2.
each.
$500.00
$500.00
Q.
P.
MISCELLANEOUS FEES
1. Voluntary address change, administrative. $250.00
2. Public hearing signs. $20.00
3. Public notice mailings, each. First class
postage rate.
Page 18 of 18
Newspaper advertisement, each.Actual cost
charge News-
Press
The Community Development Department Director may
waive any application fee when the City is the applicant or
variance application fees for single-family dwellings when the
applicant is indigent and provides an affidavit that shows
family income to be below 80 percent of the median income
for the Fort Myers/Cape Coral Metropolitan Statistical Area
(MSA) as defined by the latest available Housing and Urban
Development (HUD) Section 8 Income Limits, and provides a
financial statement showing net assets of less than
$10,000.00.
1. Resolution No. 2014-26 are hereby rescinded.
1. This resolution shall become effective immediately upon adoption.